[Skip to content]

Search our Site
  • Instagram Icon
  • RSS Icon
  • Twitter Icon
  • Facebook Icon
  • YouTube Icon
  • London 2017
  • Run Britain
  • Run Britain Rankings
  • Power of IO
  • UKA Coach
UK Athletics

Yelling buoyant ahead of Berlin

Share this

Share to Twitter Share to Facebook Tell friends via WhatsApp Email us

Liz Yelling is confident she can carry her good form into the Berlin marathon after finishing runner-up in Sunday's Great Scottish half marathon.


The Commonwealth bronze medallist is set to face a star-studded field headed by Japan's Olympic champion Mizuki Noguchi in the German capital on September 24. Her time of 70mins 51secs, just six seconds behind Kenyan winner Caroline Cheptangi, in Glasgow has left her in buoyant mood.

"I ran it at the pace I wanted, picked off a group of Kenyans in the closing stages and still had something left at the end," said Yelling.


After Berlin Yelling plans to have an operation on a shoulder injury that has troubled her since she fell during the Great Edinburgh cross-country international in January. Then she hopes to mount a challenge for a place in the Norwich Union GB team at the European Cross-Country Championships in Italy in December. She said: "I aim to start cross-training pretty soon after the op,  even if I shan't be able to run for a while."


Yelling's commitment to Berlin means she is unavailable to represent Great Britain at the IAAF World Road-Running Championships in Debrecen, Hungary on October 8 over the half-marathon distance.

These news feeds have been supplied direct to this site (www.ukathletics.net) by the Press Association (PA).
By accessing this section of the web site, the user agrees that the PA Material may only be used for the user's personal use, that the distribution or commercial exploitation of the PA Material by such user is prohibited and that use of the PA Material is at the sole risk of such user. Neither UK Athletics nor the PA gives any warranty that the supply of the PA Material will be uninterrupted or as to the accuracy of the PA Material or as to the results to be obtained from the PA Material. The PA will take all reasonable steps to ensure the accuracy and timely supply of the PA Material, but the PA does not warrant that the PA Material will be free from error or uninterrupted or, as provision of the PA Material is subject to the availability of the necessary information to the PA, that specific items of information will be available.